The high performance of Elevate SBS Products has been well-established for many years, and Elevate UltraWhite™ granules, introduced in 2010, have demonstrated outstanding solar reflectivity, do not require coating or re-coating, and avoid the hail damage susceptibility associated with many other brands of reflective modified bitumen cap sheets.
Elevate is pleased to combine our SBS and UltraWhite products in the Elevate 30-Year SBS Platinum Warranty, now featuring additional options. Projects eligible for the 30-Year Platinum Warranty must meet the criteria shown below.
Elevate 30-Year SBS Platinum Warranty System Criteria
Slope: ¼” (2.1%) minimum slope to drain
Insulation: Elevate ISO 95+™ GL or RESISTA™, minimum thickness 1″ (2.5 cm)
Coverboard: Elevate ISOGARD™ HD Cover Board
Attachment: | Mechanical | Minimum 16 Elevate Heavy Duty, Heavy Duty Plus, or Concrete Drive Fasteners and Plates per 4′ x 8′ (1.2 m x 2.4 m) board, with perimeter/corner enhancements. |
Adhesive | I.S.O. Twin Pack TM, I.S.O. FixTM II, or I.S.O.Stick™ Insulation Adhesive with a minimum bead spacing of 12″ (30 cm) / 6″ (15 cm) / 4″ (10 cm) in the field/perimeter/corners; OR ISO Spray™ R Insulation Adhesive applied at a minimum of 4″ (10 cm) throughout or in a full spray; OR Elevate LiquiGard Adhesive. | |
Membrane Options: | Cold-Applied (see note below) | Three plies are required. The first ply may be BASEGARD™ SA, SBS Poly Base, SBS Premium Poly Base, or SBS Premium Base. The second ply may be SBS Poly Base, SBS Premium Poly Base, or SBS Premium Base. The cap sheet must be SBS Premium FR UltraWhite. |
Heat-Welded | Three plies are required. The first ply may be BASEGARD SA, SBS Poly Torch Base, or SBA Premium Poly Base. The second ply may be SBS Poly Torch Base or SBS Premium Poly Base. The cap sheet must be SBS Premium FR Torch UltraWhite. | |
Flashings: | Field | Pipes, curbs, drains, etc. must be flashed with Elevate UltraFlash™ Two-Part Liquid Flashing. |
Wall | Elevate UltraFlash Two-Part Liquid Flashing; OR SBS Premium Base and SBS Premium FR Ultra White set in Firestone Multi-Purpose MB Flashing Cement; OR BASEGARD SA and SBS Premium Torch FR UltraWhite. |
NOTE: When installing three (3) plies in Elevate Multi-Purpose MB Cold Adhesive, it is necessary for the first two plies to cure for a minimum of 30 days before the third ply is applied.
For further information and assistance please contact please contact Quality Building Services 800-428-4511 for further information.